Skip to content

Proportional Input Node

The proportional input node is intended for a simple case of where fixed ratio of flow is required to be distributed to multiple downstream routes. API Reference.

NameDescriptionRequired
allocation penaltyThe cost per unit flow via the nodeOptional
factorsThe factors to force on the additional splits. Number of extra_slot is assumed to be one less than the length of factors (as per pywr.nodes.MultiSplitLink documentation)Optional
slot_namesThe identifiers to refer to the slots when connect from this Node. Length must be one more than the number of extra slots requiredOptional
flowThe amount of water supplied by the catchment each timestepOptional

coming soon…