Skip to content

Input Node

Input nodes represent water inputs into the system.

At each time step an input node can provide as much water as set by the Max Flow attribute. However, unlike Catchment nodes which are required to release the volume of water that is defined in their Flow attribute, input nodes are not required to release any water unless they have a non-zero Min Flow.

Input nodes are often used to represent sources that are defined by yields. They are often used to represent groundwater yields.

API Reference.

NameDescriptionRequired
Allocation PenaltyThe alllocation cost per unit flow via the nodeOptional
Max FlowThe maximum flow constraint on the nodeOptional
Min FlowThe minimum flow constraint on the nodeOptional

coming soon…